(281) 598-1170

© 2025 Collaborative Engineering Group (CEG). All Rights Reserved.

United Airlines
Terminal B Processor

Houston, Texas
  • Architect
    Page, Now Stantec
  • Project Completion
    Late 2026
  • Project Budget
    $660,000,000

The existing IAH Terminal B was placed into service in 1969, but the needs of this terminal have changed along with the growth of the city and developments post September 11th. This project includes the renovation of the Terminal B Processor which includes ticketing, baggage, security, concessions, parking, and airport system offices; the airside components of Terminal B are part of a separate scope that is being designed and built by a different team.

The existing Processor structure is approximately 530,000 square feet, and that existing structure is being retained but being provided with completely new MEP infrastructure; a new structure is being built alongside the old, meaning the new Processor will have over 1 million square feet of area. 

Collaborative Engineering Group’s scope has been to provide 50% of the mechanical design services from DD through CA, and 90% of the plumbing design services.

Latest projects

View all projects